RFQ response: within RFQ response: 24 business hours qlcl@fe2tech.com
MON–SAT · 8:00–17:00 GMT+7
Home / Capabilities and process

Machining capabilities for complex parts

Machining scope | Drawing review | Quotation and production lead times | Progress updates.

24 hQuotation
85CNC machines
±0.005mm typical
3Shifts per day
WeeklyProgress update
Why Far East High Tech

Specifications and process

Equipment, engineering responsibility and turnaround times.

  1. 01

    Hardened tool steel and complex geometry

    Hardened material · complex geometry

    Machining: hardened tool steel, thin walls, deep pockets, positional tolerances across multiple setups | EDM/wire-cut: Sodick | Finish grinding: Okamoto, Chevalier.

    • Hard materialTool steel, stainless steel (SKD11 · SKD61 · D2 · H13 · 17-4PH · 420)
    • Geometry3, 4 and 5-axis milling · thin-wall and deep-pocket parts
    • EDM/wire-cutSodick | Machining of internal corners and tight radii.
    • Finish grindingOkamoto, Chevalier | Typical tolerance: ±0.005 mm.
  2. 02

    RFQs are handled by engineers

    Single point of contact for engineering and sales

    Engineer responsible for the RFQ through shipment | Scope: machinability, tolerances, fixturing, material changes.

    • Drawing reviewResponsible engineer
    • Technical clarificationMissing information confirmed
    • Machining documents2D drawing; STEP for reference
    • SubstitutionWritten approval before production.
  3. 03

    Short lead times, three shifts a day

    One floor · three shifts

    Processes: milling, turning, grinding, EDM, inspection | 3 shifts/day | Prototype: 3–7 days | Small batch: 7–14 days | Repeat batches: agreed schedule.

    • Prototype3–7 days
    • Small batch7–14 days
    • Mass productionBy agreement, scheduled when the PO is accepted
    • Capacity85 CNC machines running three shifts a day
  4. 04

    Weekly progress update

    Progress report contents

    Weekly update by email: current operation; quantity completed; next step; issues affecting delivery date.

    • FrequencyEvery week while the order is open
    • ContentsStep reached · quantity complete · next milestone · risks
    • Issues identifiedReported when found, together with the available options
    • Delivery schedule changesNotified by phone
  5. 05

    RFQ response within 24 business hours

    Quotation time

    RFQ: 2D PDF, STEP/IGES, quantity, required delivery date | Technical response/quotation: within 1 business day once information is complete.

    • TurnaroundWithin 24 business hours
    • What we need2D PDF + STEP / IGES · material · quantity · tolerance · finish
    • Missing informationConfirmed before quotation
    • RFQ channelsEmail, WhatsApp, Zalo
Specifications
24 hQuotation
3–7 daysPrototype
7–14 daysSmall batch
WeeklyProgress update
Progress report sample

Weekly progress report

Weekly email report: PO; operation; quantity completed; next step; delivery date.

Delivery date changes: notified by phone and updated by email.

Example (week 3)
  • OrderPO 2451: mounting bracket, 6061-T6, 250 pcs
  • Step04 of 07: CNC machining, 180 of 250 complete
  • DoneFirst article approved, roughing complete on the balance
  • NextGrinding, then CMM report with inch and mm values
  • DeliveryUnchanged

Submit a drawing for feasibility review and quotation.

STEP / IGES + 2D PDF · Material grade · Quantity · Tolerance · Finish

Or write to qlcl@fe2tech.com · Call +84 707 733 399 · +84 968 860 386

WhatsApp